1 - Solar panels have been installed on the school roof.
2 - The Sacred Heart of Jesus statue in the vestibule of the Thaddeus Room was painted.
3 - The St. Stephen's Food Pantry was built.
4- Automatic door openers were built in the Breezeway.
5 - The St. Clare Chapel is undergoing a complete renovation. There is new floor tiling, the ceiling is repaired and painted, the vestibule/entrance is redesigned, the altar trim is painted with a gold highlight, there is new lighting, a new tapestry of St.Clare and St. Francis is hung, a new outside chapel sign, and the entrance door is painted. New style seating is on its' way.
6 - The altar server chairs and tables have been refinished in the church sanctuary.
7 - Two new chest of drawers have been placed at the main church entrance.
8 - A new Baldacchino was installed over the newly repaired and refinished tabernacle.
9 - The Monsignor Lauriola plaque was moved to the church's side entrance next the founding members roll.
10- A new statue of the Blessed Mother is installed on the wall of main church entrance.
11 - The outside concrete damaged sidewalk/surface to both doors to the Madigan Hall are being replaced.